🏗️ Got Caught Building Without a Permit? Here’s What to Do Next (and How We Help)

 

For homeowners, flippers, or general contractors who started work without a permit—or had a project shut down midstream—getting back on track can feel overwhelming. Whether you poured a foundation, framed walls, installed plumbing, or built an entire addition without approval, you’re now dealing with red tags, fines, or a full stop on your investment. This is more common than you might think—and Finish Masters Builders Corp. specializes in solving it.

We offer professional construction consulting services across Massachusetts and New Hampshire for clients facing building permit violations. Our job is to step in, take control, legalize what’s been done, and bring your project to code so it can move forward.

🔍 What Happens If You Build Without a Permit?

In both Massachusetts and New Hampshire, unpermitted work can lead to:

  • Stop work orders and red tags

  • Fines or daily penalties

  • Liens or delay of sale/refinancing

  • Mandatory demolition of completed work

  • Legal exposure for unsafe construction

If your local inspector finds unpermitted work, they’ll typically issue a stop order until the situation is resolved. You can’t finish, you can’t sell, and in some cases, you can’t even live in the space legally.

That’s where we come in.

✅ How Finish Masters Gets You Back in Compliance

Finish Masters provides turnkey solutions to legalize and recover non-permitted construction jobs. Here’s what we do:

1. Site Evaluation

We visit your property to evaluate the current work and document everything that’s been done. This includes structural framing, plumbing, HVAC, electrical, or foundation changes.

2. As-Built Documentation

If plans were never drawn, we generate as-built drawings reflecting current conditions. These serve as a starting point for getting legal approval from your town.

3. Architectural & Structural Support

We connect you with licensed architects and engineers to produce plans, load calculations, or framing details as needed to satisfy your building department.

4. Permit Filing & Inspector Coordination

We prepare and file your permit application on your behalf, communicate with your local building inspector, and negotiate what work (if any) needs to be removed or updated.

5. Scope Development & Code Corrections

We provide you with a clear, itemized scope to correct deficiencies. Finish Masters can either manage the job directly or coordinate with your subs to ensure every item is fixed properly.

6. Construction Management

Once your permits are approved, we handle project execution—from structural retrofits to interior finishes. Our work is always to code, and we manage every inspection.

7. Final Sign-Off

We bring your project to the final inspection stage and secure sign-off, so you can legally occupy or sell the space without future risk.

💡 Why You Shouldn’t Wait to Fix a Permit Problem

Every day you wait increases:

  • The potential for more fines

  • Your exposure to liability or insurance denial

  • The likelihood of further demolition being required

Permits aren’t just red tape—they protect you and your investment. We understand how stressful this situation can be, and we take over the burden with discretion, speed, and professionalism.

📍 Available Throughout Massachusetts & New Hampshire

We’ve helped clients recover unpermitted jobs in towns like:

  • Burlington, MA – Red-tagged home additions

  • Hudson, NH – Unpermitted finished basement discovered during sale

  • Andover, MA – Sunroom built without structural review

  • Merrimack, NH – Garage conversion flagged by zoning

We know how to work with building departments throughout the region and speak their language to get your job moving again.

📸 Real Results: From Red Tag to Final Sign-Off

One homeowner in Westford, MA had their project red-tagged for installing a master bath without plumbing permits. Finish Masters stepped in, created as-built plans, coordinated a plumbing engineer, filed for retroactive permits, and completed the work with full code compliance—all within 3 weeks. Their final inspection passed without issue, and they closed on the sale of their home 10 days later.

📞 Call Finish Masters Today—Let’s Get It Legal

Don’t let a permit issue derail your investment. Whether you’re trying to finish a job, sell your home, or just make things right, Finish Masters Builders Corp. is ready to help.

Retroactive Permits
Code Compliance Plans
Project Management
Structural & Architectural Coordination


📞 Call (978) 600-1979
📍 Serving all of Massachusetts & Southern New Hampshire

Your project deserves a second chance. Let Finish Masters take it from red tag to green light.